  • PPS CUP 1.0
  • Product Display
    650ML
  • Product Type
    200ML 400ML 650ML 850ML
  • Product Parts
    LIDS LINERS CAPS HARD CUP COLLAR
  • view product parmeters
Product Details

200ML 400ML 650ml 800ml,

One Set=One liner+one lid+one cap+one outer cup,

Thunder Finish PPS paint preparation system production quality control process:
Liners Control:
First check, When the liners come out from the machine.
Checkers will have a first check on the surface of all cups one by one. If some cups are bad look with black tiny spot, or incomplete, they will throw into a big box, which stock all Unqualified liners.
Second check, daily checking with Lids.
Third check, when packing the liners each 25 pcs into polybag, packers will also check on the surface of liners for last time, to avoid any missing at the First check.

Lids Control:
1.First check, When the lids come out from the machine.
Checkers will have a first check on the surface of all lids one by one. If some lids are bad look with black tiny spot, or incomplete, they will throw into a big box, which stock all Unqualified lids.
2.Second check, inspector will pick up 5 pcs everyday, and measure the diameter, and deliver the report to the QC Manager everyday.
3.Third check, when welding the filter for lids, workers will also check again on the surface of lids, to avoid any missing at the First check.

Daily Inspection:
The main inspection issue is Leaking.
Every day, we have 2 times check on the leaking issues.
1.In the morning, 2 inspectors will pick up 5 sets PPS which just produced. And filled with water, combined with hard cups and adapters. Then upturned on the table. They will check the if leaking or not. And after finish testing, deliver the Report to the QC Manager.
2. In the Afternoon, 2 inspectors will pick up 5 sets PPS which just produced in the afternoon, and check the leaking issue. And after finish testing, deliver the Report to the QC Manager.

Each batch quality control:
When we finish an order, we will have below inspection steps.
Check the cartons surface, if any cartons broken, we will replace new carton.
Check the marks on the carton, if it is as customers requirements or not.
Leaking inspection, inspectors will pick 10 sets from 10 boxes. And test by 2 times, morning and afternoon, 5 sets each time. Then deliver the report to QC Manager. And QC Manager & Production Manager will check the results again. After both of them agree the results, and then sign on the sheet, it means the order is agree to ship out.

Message

If you have any questions or questions,please email or usr our contacts.We will be happy to answer your questions.

If you have any questions or suggestions,please leave us a message and we will reply to you as soon as possible.